What is SMED?

 

SMED stands for Single Minute Exchange of Dies, concept originally developed in Japan for Toyota in order to change from making one model to another in less than 10 minutes i.e. "single minute". It was then applied to Automotive Industry to reduce set up times for production of pressed car parts and today has been applied successfully in all industry and service sectors in very diverse applications.

 

 

 

 

 

For more details about the programme, please contact EMS team>

 

 

 

Enquire about the programme

Enquire

 

The technique concentrates on change-over profile, which is the time taken to changeover a machine from the last ‘GOOD’ product of one run to the first ‘GOOD’ product of the next production run at the acceptable speed.

 

EMS runs 3-day on-site SMED workshops to teach, apply and implement the SMED techniques on your processes to significantly reduce change over time and develop a culture of continuous improvement within the operations team.

 

 

Benefits of Change-Over-Reduction

  • Increased throughput - OEE improved
  • Make to demand - quick response to customer
  • Smaller runs- greater flexibility
  • Shorter Lead Times- less time spent in Factory
  • Reduced Waste- Start Up losses reduced
  • Reduced Stock Levels, Better use of Space

What are the goals of SMED?

  • To reduce Change-Over to the MINIMUM time possible
  • NOT compromising on Safety and Quality
  • A series of No cost / low cost improvements
  • Structured Methodology
  • SMED is about working Smarter not Harder

 

 

 

 